Groundsure HS2 and Crossrail 1

The Groundsure HS2 and Crossrail 1 report identifies the proximity of any site to the new High Speed 2 London to Birmingham, and Birmingham to Leeds and Manchester rail networks, as well as defining the top speed of trains at any given point, helping people assess factors such as possible noise pollution. The report also contains data on the proposed Crossrail 1 route, including stations, worksites and the line itself.

Groundsure also offers a combined energy and infrastructure report for commercial property transactions. This includes details on energy as well as HS2 and Crossrail 1 - see more details.

Product Details

The report provides detailed insight into the potential effects that the HS2 and Crossrail 1 projects could have on the property or site.

The information includes:

Key features

Why is this important?

Identifies whether the property is within a 5000m radius of the proposed route of phase 1 or phase 2 of the HS2 project. Details the maximum speed of the train and measures the distance to the nearest point of the proposed route.

 

The Government has increased commitment to HS2, giving cause for concern regarding the impact on property prices and noise pollution. This highly cost effective report clearly identifies any legitimate issues.

Provides information on construction sites and all worksites within a 1000m radius of the property.

Potential problems may include subsidence, vibration and noise pollution. 

Includes proposed construction timetable and all Crossrail 1 stations within 5000m radius.

Helps you to assess potential disruption problems.

Details safeguarding areas and compensation zones around the HS2 and Crossrail route.

Important to know if the property falls within a safeguarding area as the land is protected by the Government from development. This could highly impact the value and saleability of the property or site.

£10million Professional Indemnity Insurance.

Can be relied upon by all professional parties within the transaction.

  • Compensation schemes
  • Construction timetable
  • Proximity
  • £10million PI